Stanley Village Road, Stanley

Drain replacement at 58 Stanley Village Road

Drain replacement and refurbishment at 58 Stanley Village Road took place in 2024–2025.

Drainage works on Stanley Village Road
A worker beside the enclosed drainage excavation along Stanley Village Road.

Scope of work

A narrow trench, excavating plant and temporary cones mark the course of the roadside drain. Closer views record work inside the opened section.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 77, 205. View project record

Worker inside an opened drain excavation
58 Stanley Village Road. Worker inside an opened drain excavation · Company profile, p. 205
Narrow trench along the edge of the road
58 Stanley Village Road. Narrow trench along the edge of the road · Company profile, p. 205
Cones and excavator beside the village road
58 Stanley Village Road. Cones and excavator beside the village road · Company profile, p. 205
Cones marking out the work zone at the road edge
58 Stanley Village Road. Cones marking out the work zone at the road edge · Company profile, p. 205
White building frontage adjoining the drainage works
58 Stanley Village Road. White building frontage adjoining the drainage works · Company profile, p. 205
Inspection point beside a cover in the roadway
58 Stanley Village Road. Inspection point beside a cover in the roadway · Company profile, p. 205
Opening in the pavement beside a tool case
58 Stanley Village Road. Opening in the pavement beside a tool case · Company profile, p. 205
Long stretch of roadworks protected by cones
58 Stanley Village Road. Long stretch of roadworks protected by cones · Company profile, p. 205
Groundworks cordoned off along the roadside
58 Stanley Village Road. Groundworks cordoned off along the roadside · Company profile, p. 205
Pipe run exposed in a narrow trench
58 Stanley Village Road. Pipe run exposed in a narrow trench · Company profile, p. 205
Open trench and broken concrete edges at the road surface
58 Stanley Village Road. Open trench and broken concrete edges at the road surface · Company profile, p. 205
Drain opening exposed below the pavement
58 Stanley Village Road. Drain opening exposed below the pavement · Company profile, p. 205
Worker at an exposed pipe connection
58 Stanley Village Road. Worker at an exposed pipe connection · Company profile, p. 205
Drainage work zone viewed along the slope of the road
58 Stanley Village Road. Drainage work zone viewed along the slope of the road · Company profile, p. 205

Photographs & drawings

All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team