7 images
B&Q at MegaBox
The retail entry and register identify B&Q at Enterprise Square Five, levels 3–4, with consultancy, interior design and fit-out (pp. 72, 91–92).
Project record · Design and fit-out of the B&Q store at MegaBox7 images
The retail entry and register identify B&Q at Enterprise Square Five, levels 3–4, with consultancy, interior design and fit-out (pp. 72, 91–92).
Project record · Design and fit-out of the B&Q store at MegaBox





