MILTON萬昇建築工程

23–29 Fung Tak Road, Wong Tai Sin

Water tank and pump submissions at On Lok Building

The On Lok Building project on Fung Tak Road, Wong Tai Sin, concerned statutory submissions for water tank and pump works in 2016–2018.

Pump equipment at On Lok Building
Pump, metal support and pipe connections at the Fung Tak Road building.

Scope of work

The address is 23–29 Fung Tak Road. The photographs move from the entrance into the plant area, recording a metal tank, pumping equipment and a site measurement.

Project source Milton Construction Engineering Limited, 2025 company profile, p. 138. View project record

Tape measure across a wall edge and metal panel
A tape measure marks the distance across the wall edge and adjacent panel beside the equipment · Company profile, p. 138
Metal tank at On Lok Building
The side view shows the tank casing, folded edges and base support · Company profile, p. 138
On Lok Building name above the entrance
The building name sits above the vertical metalwork at the street entrance · Company profile, p. 138