MILTON萬昇建築工程

114–116 Boundary Street, Kowloon

Building refurbishment at Shung Ming Mansion

Shung Ming Mansion at 114–116 Boundary Street was refurbished in 2018 in connection with the mandatory building and window inspection schemes.

Concrete repair at Shung Ming Mansion
Overhead concrete repairs in a common area at the Boundary Street property.

Scope of work

Street photographs show netting around the building envelope. Inside the covered area, other views document overhead concrete repairs, wall-finish samples and the coatings held on site.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 71, 118–119. View project record

Wall-finish samples at Shung Ming Mansion
Wall-finish samples and railings at the Boundary Street building.
Coating containers stacked at the repair site
The Shung Ming Mansion repair record shows coating containers and coiled material stored together · Company profile, p. 119
Protective netting and scaffolding outside Shung Ming Mansion
A street view shows scaffolding and protective netting extending up to the roof of Shung Ming Mansion · Company profile, p. 119
Worker attending to an overhead surface from a ladder
Inside a covered area at Shung Ming Mansion, a worker reaches the exposed overhead surface from a timber ladder · Company profile, p. 119
Looking up at netting around an upper building corner
From below, the protective netting and projecting scaffolding meet at the upper building corner · Company profile, p. 119

Photographs & drawings

All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team