Nin Wah Road, Cheung Muk Tau, Sai Kung
Building refurbishment at Father Sean Burke Care Home
Helping Hand’s Father Sean Burke Care Home for the Elderly underwent building refurbishment in 2016 in connection with the mandatory window and building inspection schemes.
Scope of work
Low-rise blocks sit alongside a lawn and covered walkway. The profile includes both the exterior arcade and an indoor corridor, giving a view of the care-home setting.
Project source Milton Construction Engineering Limited, 2025 company profile, pp. 157–158. View project record




