1002 Jianshe Road, Luohu, Shenzhen
Health room and lobby design management at Shangri-La Shenzhen
The project record for Shangri-La Shenzhen, 1002 Jianshe Road, identifies design and construction management for health-room and lobby spaces.
Scope of work
The project sheet dates this assignment to 2015–2016. The hotel frontage and entrance name on the east side of the railway station identify the property connected to the interior work.
A separate index entry dated December 2011 also records health-room and lobby design and construction management at the hotel.
Project source Milton Construction Engineering Limited, 2025 company profile, pp. 78, 159–160. View project record
