73–77 Lei Muk Road, Kwai Chung
Emergency electrical system replacement at Seapower Centre
Seapower Centre at 73–77 Lei Muk Road, Kwai Chung, underwent emergency electrical system replacement in 2022.
Scope of work
The photographs move from the building frontage to the equipment area, where test instruments, a temporary working platform and an equipment examination are visible.
Project source Milton Construction Engineering Limited, 2025 company profile, p. 186. View project record










