MILTON萬昇建築工程

Tsim Sha Tsui, Kowloon

Refurbishment at The Peninsula Hong Kong

The 2018–2019 refurbishment at The Peninsula Hong Kong is documented in photographs of a stone vanity and wall panelling.

Vanity and wall panels at the Peninsula
Pale wall panels, stone counter and recessed lighting in the Peninsula Hotel refurbishment.

Scope of work

Close views record the junctions between the washstand, mirrored surfaces and wall panels. A street photograph identifies the property by its window bays and stone façade.

A separate entry in the works index records lobby design and construction management at the hotel in November 2010.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 78, 177–178. View project record

Mirrored wall finish at the Peninsula
Stone counters, mirrors and light fittings during the Peninsula Hotel works.
Rows of windows and stone detailing on the hotel façade
The Peninsula Hong Kong. Rows of windows and stone detailing on the hotel façade · Company profile, p. 177
Stone washstand under construction beside the wall panelling
The Peninsula Hong Kong. Stone washstand under construction beside the wall panelling · Company profile, p. 178

Photographs & drawings

All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team