MILTON萬昇建築工程

8 Sham Tsz Street, Sham Tseng

Project management at Ocean Pointe

The 2017–2018 project at Ocean Pointe, 8 Sham Tsz Street, Sham Tseng, concerned construction management.

Landscaped vehicular entrance between residential towers
The Ocean Pointe setting is seen from the street, with planted podium levels and residential blocks behind · Company profile, p. 93

Scope of work

The project sheet identifies a major management assignment. The works index specifies construction and fit-out design management for three blocks.

The photographs place the towers in their estate setting, alongside the driveway, podium and pool.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 72, 93–94. View project record

Waterfront towers at Ocean Pointe
Residential towers at Ocean Pointe in Sham Tseng with the water beyond.
Stone entrance wall with towers beyond
Railings line the stone entrance wall, with Ocean Pointe’s towers rising beyond · Company profile, p. 93
Seating beside tall glazing overlooking trees
A setting photograph on the Ocean Pointe plate shows seating beside tall windows looking onto planting · Company profile, p. 94
Pool with residential towers beyond
A small context photograph brings the pool, planting and residential towers into one view · Company profile, p. 94
Residential window grid and roofline
The small profile photograph records a grid of green-tinted windows beneath the residential roofline · Company profile, p. 94
Ocean Pointe towers above the podium
Dark window bands and pale elevations rise above the Ocean Pointe podium in this street view · Company profile, p. 94

Photographs & drawings

All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team