7–9 South Wall Road, Kowloon City
Hoi Sing Building refurbishment
Hoi Sing Building at 7–9 South Wall Road, Kowloon City, was refurbished in 2018. The works index identifies repairs under the mandatory building inspection scheme.
Scope of work
Two street views show the façade behind scaffolding and then the pale wall surfaces and window ledges after scaffold removal. The building name above the metal entrance gate provides a further location reference.
Project source Milton Construction Engineering Limited, 2025 company profile, pp. 71, 120–121. View project record



