Central, Hong Kong Island
California Tower, first and second floors
Additions and alterations on the first and second floors of California Tower at 32 D’Aguilar Street.
Scope of work
From D’Aguilar Street the dark façade of California Tower rises high above its podium. The commission centred on two floors near street level. An early Milton portfolio called the project Fovea Hong Kong. The subsequent joint archive preserves its floor references and a paired exterior and interior photograph.
Locating two floors within the tower
The night photograph looks up at the corner of California Tower from pavement level, tracing the lit elevations back from D’Aguilar Street. The 2016 entry identifies the first and second floors individually and classifies the work as additions and alterations. Those floor references locate the commission much more precisely than the familiar exterior of this Central landmark could on its own.
From the street to the interior detail
The interior photograph shows a circular illuminated feature suspended under the ceiling, with darker metalwork and warm-toned surfaces behind. It gives the view at room scale that the street photograph cannot show. The historical project sheet records HK$7.5 million for the commission, tying a stated works value to a specified pair of floors and the surviving interior view.
Project source Milton / Ryer joint archive View project record



