Siu Ho Wan, Lantau Island
Siu Ho Wan concrete plant
A 2012 plant construction record at Siu Ho Wan, with structural steelwork identified in the older portfolio.
Scope of work
The profile opens with a view of the industrial setting on Lantau’s coast, followed by photographs of silos and conveying equipment. The earlier Milton and Ryer portfolio identifies structural steelwork for the concrete plant. Read together, the written scope and the photographs locate the construction package within a larger industrial installation.
Project source Milton Construction Engineering Limited, 2025 company profile, pp. 89–90






