MILTON萬昇建築工程

7 images

Siu Ho Wan concrete plant

Pages 89–90 document plant construction at Siu Ho Wan on Lantau Island, with views of the site, silos and conveyors.

Project record · Siu Ho Wan concrete plant
Silos, hopper and steel frames
Silos, a hopper and yellow structural supports at the plant · Company profile, p. 90
Aerial view of the coastal plant
The coastal plant site in relation to the hillside and neighbouring roads · Company profile, p. 89
Inclined plant conveyor
An inclined conveyor crosses a working area of the plant · Company profile, p. 90
Plant construction area
Long structural elements on the site with a ridgeline beyond · Company profile, p. 90
Upper plant component beside a square opening
A detail from the Siu Ho Wan plant shows a square opening beside a raised equipment housing · Company profile, p. 90
Tops of two cylindrical silos against a blue sky
A high-level link connects two cylindrical silos at the Siu Ho Wan plant · Company profile, p. 90
Bank of silver silos above the plant frontage
A frontal view of the Siu Ho Wan concrete plant records the closely spaced bank of silver silos · Company profile, p. 90
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team