Pok Fu Lam, Hong Kong Island

Central air conditioning at Queen Mary Hospital

Installation works for the hospital’s central air-conditioning system in 2019.

Air-conditioning plant on rails
Heavy plant on parallel rails, with the crew behind the unit.

Scope of work

The source shows large items of plant prepared for movement outside the building and further views of the equipment indoors. Slings and lifting equipment at the entrance give way to pipework and connections inside. The case sheet defines the package as central air-conditioning works.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 112–113

Plant handling outside the equipment room
A crew handles large equipment with lifting gear outside the plant room.
Workers installing the plant
Workers beside the base during installation of the air-conditioning plant.
Plant feet and casing
The cylindrical casing and metal feet at the base of the equipment.

Photographs & drawings

Rounded end housings of the air-conditioning plant
A view from the end of the Queen Mary Hospital plant shows its circular housings and upper pipework · Company profile, p. 113
Crew positioning plant beside a delivery vehicle
Crew members guide the circular plant housing beside a delivery vehicle, above the handling bars · Company profile, p. 113