MILTON萬昇建築工程

Lantau Island, Islands District

Licensing and structural works at Ngong Ping 360

Licensing and structural works at Ngong Ping 360 on Lantau Island.

Ngong Ping 360 visitor entrance
Ngong Ping 360 signage and the covered visitor entrance.

Scope of work

The company names Ngong Ping 360 as the site and dates the entry to 2024–2025. Signage at the entrance and visitor space identify the setting in the photographs. The scope recorded in the project sheet is licensing and structural work at the premises.

Project source Milton Construction Engineering Limited, 2025 company profile, p. 197

Protective panel in an interior work area
A large protective panel and a stepladder in a dark interior work area.

Photographs & drawings

Supports, pipes and structure above the ceiling
Licensing and structural works at Ngong Ping 360. Supports, pipes and structure above the ceiling · Company profile, p. 197
Ngong Ping 360 lettering and roofline at the entrance
Licensing and structural works at Ngong Ping 360. Ngong Ping 360 lettering and roofline at the entrance · Company profile, p. 197
Interior with red walls and an arched opening
Licensing and structural works at Ngong Ping 360. Interior with red walls and an arched opening · Company profile, p. 197
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team