MILTON萬昇建築工程

South Bay, Hong Kong Island

Residential interiors at Ruby Court

A residential interior fit-out in a unit at Ruby Court, South Bay.

Timber-lined living and dining room
Timber television wall, dining table and indirect lighting in the Ruby Court living room.

Scope of work

A television wall, recessed ceiling lighting and small round tables appear in the living-room view. Closer photographs follow the circulation space, bathroom and joinery. Together they move from the scale of a furnished room to the details of openings, cabinets and finishes. The profile dates the residential fit-out to 2019–2020.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 170–171

Window platform and recessed lighting
A low window platform runs along the empty living room below a recessed ceiling light.
Pale timber desk and window seat
Pale timber joinery forms a desk and window seat in a smaller room.
Bath and stone vanity
Pale stone continues from the vanity to the bath beside a horizontal mirror.
Stone bathroom wall and timber door frame
Veined stone meets a timber doorway at the bathroom threshold.

Photographs & drawings

Louvred panel and stone bath surround at Ruby Court
Pale stone, a darker wall panel and timber-toned louvres meet beside the bath · Company profile, p. 171
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team