Siu Lam, Tuen Mun

Villa construction on Lok To Street

A construction record for a villa on Lok To Street, from concrete work to the formation of the interior.

Vertical reinforcement at the Siu Lam site
Vertical reinforcement on the Siu Lam villa site with neighbouring homes beyond.

Scope of work

Three pages document the site at successive stages. Close views pick out reinforcement and concrete, while exterior photographs show scaffolding and green protective mesh. As the floors take shape, openings and walls can be followed between the exterior and interior views. The project sheet dates the construction to 2017–2022.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 163–165

Villa structure under scaffold netting
Green scaffold netting encloses the rising villa shell.
Red wall formwork on site
Reinforcing bars and timber lie alongside red wall formwork.
Exposed concrete slabs and beams
Slabs, beams and openings inside the unfinished concrete frame.
Unfinished concrete stair
Temporary handrails follow an unlined concrete stair below an exposed slab edge.
Blue pool under construction
The blue pool shell and unfinished concrete surround.

Photographs & drawings

Green netting around the rising Siu Lam villa
From the bare ground in front, reinforcement projects above the netting and concrete remains exposed below · Company profile, p. 163
Vertical wall shutters and braces
Braces hold the red wall shutters in position beside the projecting reinforcement · Company profile, p. 164
A run of wall formwork at the Siu Lam site
Viewed across the slab, the shutter line is held by timber props · Company profile, p. 164