Siu Lam villa construction

Pages 163–165 follow the construction of a villa in Siu Lam, Tuen Mun, from reinforcement and formwork to the stair and pool.

Project record · Villa construction on Lok To Street
Vertical reinforcement at the Siu Lam site
Vertical reinforcement on the Siu Lam villa site with neighbouring homes beyond · Company profile, p. 163
Villa structure under scaffold netting
Green scaffold netting encloses the rising villa shell · Company profile, p. 165
Red wall formwork on site
Reinforcing bars and timber lie alongside red wall formwork · Company profile, p. 164
Exposed concrete slabs and beams
Slabs, beams and openings inside the unfinished concrete frame · Company profile, p. 164
Unfinished concrete stair
Temporary handrails follow an unlined concrete stair below an exposed slab edge · Company profile, p. 165
Blue pool under construction
The blue pool shell and unfinished concrete surround · Company profile, p. 165
Green netting around the rising Siu Lam villa
From the bare ground in front, reinforcement projects above the netting and concrete remains exposed below · Company profile, p. 163
Vertical wall shutters and braces
Braces hold the red wall shutters in position beside the projecting reinforcement · Company profile, p. 164
A run of wall formwork at the Siu Lam site
Viewed across the slab, the shutter line is held by timber props · Company profile, p. 164
Working slab and upright timber between shutters
Upright timber, tools and wall reinforcement stand on the open slab · Company profile, p. 164
Concrete soffit above an external opening
Formwork marks remain on the soffit above a daylight opening at the end of the room · Company profile, p. 164
Beam underside and adjoining slab
Looking upwards from the room, the beam meets the floor slab on either side · Company profile, p. 164
Unfinished slab and window openings
The unlined slab retains its shutter marks above wall openings awaiting windows · Company profile, p. 164
Square column and overhead concrete beam
A column rises to a downstand beam, with scaffold visible beyond the opening · Company profile, p. 164
Window openings in an unfinished concrete wall
Green netting beyond the openings picks out the daylight positions in the unfinished room · Company profile, p. 164
Stacked access covers and pipes on site
Uninstalled access covers and pipes lie beside the excavation · Company profile, p. 164
Excavated trench and pipework beside the building
An excavator and pipework occupy the narrow strip between the structure and boundary wall · Company profile, p. 164
Black pipes laid out on the ground
Lengths of pipe and stacks of covers are set out beside the excavated area · Company profile, p. 164
Pipes and excavator beside the boundary wall
A view from the other end shows the excavator and the change in ground level · Company profile, p. 164
Reinforcement, boards and wall shutters on the deck
Timber and reinforcement are set out on the deck in front of the rising shutters · Company profile, p. 164
Metal scaffold in front of wall formwork
Metal scaffold stands beside the upright shutters during construction of the floor · Company profile, p. 164
Green scaffold netting along the side of the villa
Bare ground and an open lower level remain visible below the netting along this side of the site · Company profile, p. 164
Open deck edge with projecting reinforcement
Reinforcement projects along the edge of the open deck in front of the green scaffold netting · Company profile, p. 164
Site vehicle with a boom beside the scaffolded villa
The truck stands beside the netting, with a boom extending above the vehicle towards the works · Company profile, p. 164
Square window frame in a concrete wall
Protective material remains at the head of the window in the unfinished concrete wall · Company profile, p. 165
Two openings of different sizes in an unfinished wall
A small opening sits beside a larger framed window in the same wall · Company profile, p. 165
Tall narrow window in a concrete wall
The narrow frame is set into an unlined wall, with scaffold netting outside · Company profile, p. 165
Window frame and reveal during construction
The close view records the junction between the frame and the unfinished wall opening · Company profile, p. 165
Long window openings along the interior wall
An oblique interior view follows the line of frames along the outside wall · Company profile, p. 165
Corner openings in the open concrete interior
From one corner, openings in two exterior walls meet beneath the exposed slab · Company profile, p. 165
Close view of unfinished stair treads
Viewed from below, the concrete flight rises between temporary rails · Company profile, p. 165
Turning stair and floor opening
From the landing, the rear of the flight and the concrete walls around the slab opening are visible · Company profile, p. 165
Downward view of the unfinished stair
The view from above follows the change of direction between the flight and the landing below · Company profile, p. 165
Scaffold-wrapped corner of the Siu Lam villa
Green mesh turns the corner of the scaffolding above exposed slabs and walls · Company profile, p. 165
Pool shell from above before filling
The overhead view records the pool outline, adjoining work platform and coastal setting · Company profile, p. 165
Ladder against the pool wall above the unfinished base
From inside the shell, a ladder rests against the blue wall above the empty pool base · Company profile, p. 165
Large glazed panel in protective wrapping
The framed panel rests against the unfinished wall with its protective wrapping in place · Company profile, p. 165
Two upright pale panels on site
The panels stand inside the building with their protective covers in place · Company profile, p. 165
Glazed frames stacked beside a wall
Frames of different sizes are stored together in front of an unfinished window opening · Company profile, p. 165
Panel awaiting installation beside a window opening
A pale panel rests at an angle against the concrete beside the window · Company profile, p. 165
Frames in sunlight inside the unfinished building
Daylight falls across the unlined floor beside panels awaiting installation · Company profile, p. 165
Frame and concrete walls inside the villa
A front-facing view shows the window, a panel beside the wall and the unfinished floor · Company profile, p. 165