MILTON萬昇建築工程

Chek Lap Kok, Islands District

Airport World Trade Centre refurbishment

Refurbishment and alteration works at the Airport World Trade Centre, Hong Kong International Airport.

Conference space with a long table
A long conference table, dark wall finishes and recessed lighting beside full-height windows.

Scope of work

The company records the trade centre separately from works at the airport cargo terminal. The case sheet presents interiors and common areas of the centre, while the project index categorises the work as additions and alterations. It began in 2024 and was listed as in progress in the profile dated September 2025.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 77, 188

Curved motif across a slatted timber wall
Vertical timber slats form a sweeping motif below a curved white ceiling.
Stone-finished lift lobby
Stone-patterned wall panels frame a metal lift door.
Worktops and services during construction
Worktops and exposed overhead services during the fit-out.
Outdoor terrace beneath overhead ribs
Open overhead ribs shade a seating area on the outdoor terrace.

Photographs & drawings

Corridor with continuous indirect lighting
Airport World Trade Centre refurbishment. Corridor with continuous indirect lighting · Company profile, p. 188
Model graphic on a timber display table
Airport World Trade Centre refurbishment. Model graphic on a timber display table · Company profile, p. 188
Corporate lounge lettering on a stone-finished wall
Airport World Trade Centre refurbishment. Corporate lounge lettering on a stone-finished wall · Company profile, p. 188
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team