MILTON萬昇建築工程

14 images

Airport World Trade Centre refurbishment

Page 188’s refurbishment record includes a conference room, lift lobby, timber detailing and an outdoor terrace.

Project record · Airport World Trade Centre refurbishment
Conference space with a long table
A long conference table, dark wall finishes and recessed lighting beside full-height windows · Company profile, p. 188
Curved motif across a slatted timber wall
Vertical timber slats form a sweeping motif below a curved white ceiling · Company profile, p. 188
Stone-finished lift lobby
Stone-patterned wall panels frame a metal lift door · Company profile, p. 188
Worktops and services during construction
Worktops and exposed overhead services during the fit-out · Company profile, p. 188
Outdoor terrace beneath overhead ribs
Open overhead ribs shade a seating area on the outdoor terrace · Company profile, p. 188
Corridor with continuous indirect lighting
Airport World Trade Centre refurbishment. Corridor with continuous indirect lighting · Company profile, p. 188
Model graphic on a timber display table
Airport World Trade Centre refurbishment. Model graphic on a timber display table · Company profile, p. 188
Corporate lounge lettering on a stone-finished wall
Airport World Trade Centre refurbishment. Corporate lounge lettering on a stone-finished wall · Company profile, p. 188
Low glazed structure beside an outdoor terrace
Airport World Trade Centre refurbishment. Low glazed structure beside an outdoor terrace · Company profile, p. 188
Unfinished floor running alongside full-height glazing
Airport World Trade Centre refurbishment. Unfinished floor running alongside full-height glazing · Company profile, p. 188
Timber-toned passage leading from the lobby to glazed doors
Airport World Trade Centre refurbishment. Timber-toned passage leading from the lobby to glazed doors · Company profile, p. 188
Helmeted worker viewing the floor from beside a workbench
Airport World Trade Centre refurbishment. Helmeted worker viewing the floor from beside a workbench · Company profile, p. 188
Site team beneath an open ceiling during the fit-out
Airport World Trade Centre refurbishment. Site team beneath an open ceiling during the fit-out · Company profile, p. 188
Helmeted workers passing a temporary metal access structure
Airport World Trade Centre refurbishment. Helmeted workers passing a temporary metal access structure · Company profile, p. 188
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team