MILTON萬昇建築工程

Central, Hong Kong Island

The American Club at Two Exchange Square

Additions and alterations at the club premises on levels 48 and 49 of Two Exchange Square.

Lounge beside full-height windows
Lounge seating arranged beside full-height windows.

Scope of work

The club’s sign against a brick wall, window-side seating and timber finishes identify its high-rise setting in Central. The earlier website included the American Club among its interiors. The 2025 profile supplies the year, both floor numbers and the additions-and-alterations category for the work in Two Exchange Square.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 124–125

American Club wall lettering
The American Club Hong Kong lettering on a brick wall.
Timber-finished interior stair
Timber finishes and lighting flank an interior stair at the club.
Club corridor
White walls and recessed lights line a corridor opening onto daylight.
Dining tables overlooking the waterfront
Dining tables by windows overlooking the Central waterfront.

Photographs & drawings

Wall feature covered with protective film
Transparent sheeting protects a wall feature during the American Club alterations at Exchange Square · Company profile, p. 125
Tables, chairs and loose materials beside the windows
Tables stand beside the windows of the dining area while fit-out materials remain on the floor · Company profile, p. 125
Long bar counter and seating beside the windows
The bar counter and its row of seats lead towards the windows of the American Club · Company profile, p. 125
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team