2–8 Chung On Street, Tsuen Wan
Façade scaffolding at Chau Hop Shing Building
Three street views document Chau Hop Shing Building on Chung On Street, Tsuen Wan. The photographs move from the street corner to the podium, showing scaffold netting, a Milton banner and the ground-floor shops.
Scope of work
Looking up from Chung On Street, the scaffold rises above the commercial podium, with green netting along the street elevation. Around the corner a Milton banner hangs from the netting. The shopfronts and street sign establish the viewpoint.
Reading the street signs
The photographs place the bilingual street sign, building entrance and shopfronts in the same view. The Land Registry’s index of owners’ corporations also records the building name and address.
Project source Site photographs supplied by Milton


