MILTON萬昇建築工程
A tower wrapped in bamboo scaffolding and green mesh rises among Hong Kong apartment blocks in morning light.

Projects

Explore foundations beneath Hong Kong streets, hospital plant rooms and a hotel in Shenzhen. Find a case by place or scope and compare the site photographs with the project record.

Explore the directory
Urban construction study · Hong Kong

Project directory

Open project gallery

107 records

Granville Road, Tsim Sha Tsui

Granville Road Post Office

A Hongkong Post letter dated 12 December 2022 confirms Milton completed the reinstatement of Granville Road Post Office in Tsim Sha Tsui.

Hoi Pong Street, Sai Kung

4–12 Hoi Pong Street

Mandatory building-inspection repairs at 4–12 Hoi Pong Street, Sai Kung. The owners’ letter records Milton’s appointment in 2017 and its handling of residents’ enquiries during the works.

Siu Lam, Tuen Mun

Villa at Lok To Yuen

Detached villa and foundation works at Lok To Yuen, Siu Lam. A dated entry records site formation at the same property in 2018–2019.

Sha Tin, New Territories

Kinho Industrial Building

Works to internal and external walls, concrete structures, drains and the electrical supply, with items involving unauthorised works.

Tsing Lung Tau, Sham Tseng

Eight villas in Tsing Lung Tau

Project and safety management for eight villas at Tsing Lung Tau near Sham Tseng. An owner’s reference also describes slope investigation, design and construction.

Mun Fat Lane, Castle Peak Road, Tuen Mun

5 Mun Fat Lane

Site formation at 5 Mun Fat Lane off Castle Peak Road in Tuen Mun, dated September 2014 in the index.

Mong Kok, Kowloon

Siu Yip House

Building refurbishment under the mandatory building inspection scheme in 2019–2022. A February 2022 letter from the owners’ corporation confirms Milton’s appointment as maintenance contractor through the Urban Renewal Authority’s tendering platform.

Kowloon and Hong Kong Island

LCSD play facilities

Maintenance, repair and replacement of LCSD play equipment in Kowloon and on Hong Kong Island. A letter dated 12 June 2025 certifies substantial completion of specified works orders. The 2025 profile still listed the programme as under way.

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team