MILTON萬昇建築工程

Tsim Sha Tsui, Kowloon

Watch shop fit-out on Granville Road

Fit-out of a ground-floor watch shop at 47 Granville Road.

Watch shop frontage on Granville Road
Black shopfront and illuminated sign with interior partitions visible through the glass.

Scope of work

The shopfront meets the pavement on Granville Road. Its glazed entrance frames the display area behind it. The original case sheets pair views of the former frontage with the fitted shop. The company records a ground-floor retail fit-out in 2019–2020.

Project source Milton Construction Engineering Limited, 2025 company profile, pp. 168–169

Glazed retail entrance
A straight-on view of the metal-framed glazed entrance and ceiling lights.
Metal frame and mirror panel
Mirrored panels and a metal frame form a display partition above the unfinished floor.

Photographs & drawings

Watch shop frontage dressed with red swags
Red fabric hangs below the shop fascia in this view of the finished frontage · Company profile, p. 168
Earlier shopfront on Granville Road
The earlier panel in the profile records the original entrance opening and lighting before the shop fit-out · Company profile, p. 169
All projects

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team