MILTON萬昇建築工程

5 images

Granville Road watch shop fit-out

Pages 168–169 record the fit-out of a ground-floor watch shop in Tsim Sha Tsui, including its frontage, glazed entrance and interior display partitions.

Project record · Watch shop fit-out on Granville Road
Watch shop frontage on Granville Road
Black shopfront and illuminated sign with interior partitions visible through the glass · Company profile, p. 168
Glazed retail entrance
A straight-on view of the metal-framed glazed entrance and ceiling lights · Company profile, p. 169
Metal frame and mirror panel
Mirrored panels and a metal frame form a display partition above the unfinished floor · Company profile, p. 169
Watch shop frontage dressed with red swags
Red fabric hangs below the shop fascia in this view of the finished frontage · Company profile, p. 168
Earlier shopfront on Granville Road
The earlier panel in the profile records the original entrance opening and lighting before the shop fit-out · Company profile, p. 169
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team