Give each photograph a place and a date
Take a wide view from a safe position indoors. Include a door, window or column to orient the person reading it, then photograph the mark more closely. Number the photographs on a sketch of the room and note the floor, the wall and the time. Repeat the view after rain or a visible change. If several floors report a problem on the same day, keep a separate entry for each so the surveyor can see whether they line up.
Look at wet days and dry days
A note that drops appeared at one window corner at 9 pm is more informative than a general report of damp. Add whether it had rained, whether the podium had recently been washed and how long the patch took to dry. Leaking pipes and rain entering through roofs, podiums, windows or external walls can leave similar marks indoors. A dated photograph of an earlier repair to a window seal or wall helps the surveyor check the same area.
Agree precisely what the repair covers
The Milton and Ryer archive describes the Kwong Ming Court job in Tseung Kwan O as local waterproofing to a plant-room roof on the podium. That description names the location, the part of the building and the extent. For a new job, ask the adviser to mark the investigation area, access limits, responsibility for reinstating finishes and who will check the outcome after rain. Keep the before and after views together for the next person handling the report.


