MILTON萬昇建築工程

14 images

Inside a building inspection

Follow the inspection from a room-wide view to walls, columns and ceiling junctions. The photographs show where technicians place their instruments, read the displays and record their observations.

A worker in a blue Milton shirt holds a device beside a test-point label on a concrete column.
A Milton team member records a marked test point on a concrete column. The wider frame includes the pipework and surrounding work area.
A worker in a blue shirt holds a red meter to the face of a grey column.
A team member holds a red meter against a column, with exterior scaffolding visible beyond the bay.
A worker in a dark shirt raises a tool to the junction between a white ceiling and a timber-finished wall.
A team member reaches above a timber-finished wall to examine its junction with the ceiling using a hand tool.
A helmeted worker raises a handheld device to the head of a window with scaffolding visible outside.
From inside the room, a team member raises a handheld device to record the concrete above a window opening.
A montage of a tablet, a red meter, a team member at a column and a room with floor-height glazing.
A tablet, probes, a handheld meter and a column record appear alongside a glazed interior. The lower-right photograph is also filed with the project at 16–18 Shanghai Street, Jordan.
Hard hats, a red tool case and a helmeted worker raising a handheld device in an unfinished room.
Beside the hard hats and portable tool case, two views show a team member recording surfaces in an unfinished interior.
A worker wearing a white hard hat holds a red meter against a pale-yellow wall beside a louvre.
A team member places a meter against a pale-yellow exterior wall. The adjacent louvre and coping locate the reading on the elevation.
Four street-facing scaffolds carrying vertical or horizontal Milton banners, some over green mesh.
Vertical and horizontal Milton banners appear on scaffolded street elevations. The upper-left photograph is also recorded with Siu Yip House in Mong Kok on page 162 of the company profile.
Close-ups of a window opening, deteriorated finishes and pipework, beside a worker raising a device indoors.
Close views record how the window frame, wall finishes, joints and adjacent pipework meet. Another panel shows a worker checking the window head from inside.
An older street elevation above a hand pointing to a drawing and a blue-shirted worker beside a wall.
A street view of the full elevation is paired with a plan review and a closer look at the wall and slab junction from inside.
Four views show a street elevation, blue-shirted workers recording wall surfaces and a narrow opening.
The original series moves from a view up the street elevation to closer studies of columns, wall finishes and a metal-framed opening.
A colour thermogram, an instrument display, a worker beside a grey wall and a red tool case.
A colour thermogram and its on-screen display sit alongside a worker examining a wall and a portable tool case.
Four interior inspection views with team members, a doorway, a straightedge and a wide window opening.
Workers in orange examine wall surfaces, door openings and window areas. One panel shows a long straightedge held against a wall.
Four panels show a concrete column, a mesh-wrapped scaffold, a ceiling inspection and a colour thermogram.
The original montage brings together a column test point, exterior scaffolding, a ceiling check and a thermogram. The column and scaffold views also appear on page 63 of the company profile.
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team