MILTON萬昇建築工程

Fire safety · Legislative proposals

Who looks after a building’s fire service installations?

Two bills announced on 24 November would change how responsibility for fire service installations is assigned. Owners’ corporations and property managers can use their existing maintenance records to identify gaps in the way faults are reported and resolved.

Field note published

A long common passage, columns and overhead wayfinding sign in Bayview Garden Shopping Centre during refurbishment
A common passage at Bayview Garden Shopping Centre, Tsuen Wan, during refurbishment. An overhead sign and rows of columns mark the route through the arcade. Ryer company profile, p. 16. The same view appears in Milton’s profile on p. 211.

Who the proposal would cover

Announced on 24 November 2026. Gazettal was scheduled for 27 November and introduction into the Legislative Council for 2 December. Both proposals were awaiting legislation on 26 November.

The proposed Fire Services amendment addresses the position of a party that manages or controls an installation it does not own. The Security Bureau gives the example of a property management company. Under the proposal it could raise a defence by showing it took every reasonable step and exercised all due diligence in performing the relevant duties. Which systems the manager actually controls matters.

What the fixed-penalty proposal concerns

The companion Fixed Penalty (Fire Services) Bill targets fire safety offences where liability is clear and the facts can readily be established. The package also proposes changes to registration and discipline for registered fire service installation contractors. The November announcement sets out a legislative timetable. Existing requirements still govern the maintenance work a building orders today.

Trace one fault from report to repair

Choose a recent fire alarm fault and trace it with the manager and maintenance contractor. Identify who received the report, authorised the repair, notified affected tenants and recorded that the system was back in service. Where an installation serves both a shopping podium and a residential block, name a contact for each in the duty roster and maintenance agreement so the night shift can reach them.

A green exit sign above a glazed school door
A green exit sign above a glazed door, from the archive of the Island Christian Academy campus improvements. Milton company profile, p. 181.
All field notes

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team