MILTON萬昇建築工程

19 images

Urban building and façade repairs

Records from MacDonnell Road, Boundary Street and Lockhart Road show scaffolded elevations, surface repairs and common-area refurbishment in occupied urban buildings.

South Mansion street elevation
The MacDonnell Road residential elevation and its neighbouring buildings · Company profile, p. 81View register entry
South Mansion entrance
The street-level lobby entrance of the MacDonnell Road property · Company profile, p. 82
Repair scaffold at South Mansion
Scaffolding and safety netting during the MacDonnell Road façade works · Company profile, p. 82
Concrete repair at Shung Ming Mansion
Overhead concrete repairs in a common area at the Boundary Street property · Company profile, p. 119View register entry
Wall-finish samples at Shung Ming Mansion
Wall-finish samples and railings at the Boundary Street building · Company profile, p. 119
Repair materials on South Wall Road
Materials delivered during building refurbishment on South Wall Road · Company profile, p. 120View register entry
Street frontage at 407–417 Shanghai Street
The Shanghai Street residential elevation and upper windows at 407–417 Shanghai Street · Company profile, p. 122View register entry
Kwai Wah Court under scaffold netting
Green scaffold netting at the Sai Yee Street refurbishment site · Company profile, p. 133View register entry
Corner of Siu Yip House
The corner elevation of Siu Yip House in the repair record · Company profile, p. 161View register entry
Concrete parapet on Wong Nai Chung Road
Concrete parapet, scaffolding and temporary cables during the Wong Nai Chung Road works · Company profile, p. 192View register entry
Wall repair on Canton Road
A rectangular wall repair at 1058 Canton Road in Mong Kok · Company profile, p. 193View register entry
Scaffold netting on Elgin Street
Green scaffold netting around the frontage at 24 Elgin Street in Central · Company profile, p. 196View register entry
Scaffolded façade of Lok Chung Building
Scaffolding covers the street elevation of the building at 402–404 Lockhart Road · Company profile, p. 206View register entry
Exposed reinforcement on Lai Chi Kok Road
Reinforcement exposed by spalled concrete at the Lai Chi Kok Road building · Company profile, p. 184View register entry
Canopy along South Bay Road
Continuous canopy and street-facing elevation at 2 South Bay Road · Company profile, p. 199View register entry
Worker on scaffolding at Tai Chi Court
A worker in a helmet and harness on the scaffold at Tai Chi Court on Austin Road · Company profile, p. 204View register entry
Kong Ling Building entrance
Finished entrance steps and handrail at Kong Ling Building on Jervois Street · Company profile, p. 209View register entry
Waterfront towers at Ocean Pointe
Residential towers at Ocean Pointe in Sham Tseng with the water beyond · Company profile, p. 93View register entry
Outdoor work area at Mei Lam Estate
Outdoor work area and surrounding residential towers at Mei Lam Estate · Company profile, p. 97View register entry
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team