MILTON萬昇建築工程

5 images

Site visits and materials handling

Site visits, personnel and a delivery show the fieldwork and materials handling rarely visible in a photograph of a finished space.

Helmeted workers review drawings at the edge of an excavation and inspect steel supports inside.
A posted record identifies this as a plate load test. The team reviews the equipment at the excavation, with closer views of the reaction beam, gauges and record forms.
Helmeted team members in reflective vests check paper records and a handheld device outdoors.
On a roadside and a footway, team members use handheld equipment, consult drawings and make notes about what they observe.
Two people in reflective vests confer by the water, with a close view of a plan marked using a red pencil.
Two team members review an outdoor location beside the water. A close view shows a red-pencil mark being made on a paper plan.
People in Milton high-visibility vests view roadside features beside grass and an elevated road.
Grass, a roadside barrier and a flyover form the setting for these four views. Team members use handheld devices to record their surroundings.
Four wrapped pallets visible through the open doors of a freight container.
An open container shows four wrapped pallets held behind horizontal restraints, recording the condition of the load before unloading.
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team