Comparing tenders for building repairs

Two tenders headed “façade refurbishment” can cover different elevations, access and making good. Comparing the quantities, assumptions and undecided items helps explain a difference in price.

Illustration of engineers reviewing drawings
A drawing review illustrates a team checking design information before work.

Issue the same scope to each tenderer

The Urban Renewal Authority’s Building Rehabilitation Platform advises that tender documents should reflect the building’s condition and the solutions agreed by its owners. For façade repairs, number the elevations and mark known damage, areas awaiting investigation and windows or signs to remain. If tenderers visit the site, collect their questions. The consultant can issue a common clarification through the applicable tender procedure so prices are based on the same information.

Trace a price difference to a specific item

Give access equipment, protection of common areas, waste removal and reinstatement of finishes their own lines in the comparison. Ask the consultant which prices are fixed, which quantities are to be measured and which sums are provisional. Record a blank entry as a query and preserve the original wording. Entering zero can suggest to the management committee that the tenderer has already allowed for that item.

Record the decisions owners still need to make

Where damage can only be measured after a finish is opened up, ask how the quantity will be verified and who can authorise further work. Present these differences alongside payment stages, proposed occupation of common areas and the consultant’s assessment. Keep the accepted tender, dated clarifications and the owners’ decision together. If a resident later asks why an item formed part of the contract, the answer can be traced to a document.