How to read qualifications, allowances and options in a tender

Similar totals may rely on different assumptions about measured areas, access periods or provisional items. A tender review can make those differences visible before the owners decide.

Seen from above, amber, clear and green massing blocks sit on a floor plan beside a pair of brass dividers.
Coloured massing blocks laid over a floor plan illustrate phasing and spatial coordination.

Bring tender qualifications into the comparison

A tender covering letter may exclude a rooftop plant room, assume uninterrupted use of a corridor or require signs to be removed by the owner. Give each qualification a row with its original page number, the affected specification item, the consultant’s query and the written reply. An arcade that admits early market deliveries every day is a poor match for a price based on continuous closure. Refer that assumption to the consultant. Keep the original offer and any amounts needing verification in separate columns, with unanswered items visible to the committee. Someone joining the review should be able to trace a question back to its source.

Try two quantities against the same returns

Consider two invented figures in Hong Kong dollars. Tender A contains fixed items of $120,000 and a rate of $500 per square metre for the measured repair. Tender B contains $130,000 and a rate of $300 per square metre. With all other terms the same, 30 square metres produces totals of $135,000 and $139,000 respectively. At 80 square metres the totals become $160,000 and $154,000. The ranking changes with the quantity. Label the source of each assumed area, when it might be measured and who will verify the eventual quantity. Keep the scenarios clearly identified when recording the sum actually awarded.

Trace an allowance into the completed price

If the tender includes an allowance for a concealed pipe connection, first check that each tenderer included the same figure. Then check where opening up, materials, fitting, reinstatement and any attendance or fee are priced. A choice of finishes needs a different comparison. Establish the base finish, the addition or deduction for the alternative and the latest date for making the choice. The appointed consultant can explain which allowances and adjustments follow from the tender terms. Attach the reference of the sample eventually selected, so that a purchasing decision later in the job can be traced back to the tender review.

Keep a fair record of questions and replies

Where a question might affect more than one return, ask the consultant how the applicable tender procedure deals with common clarifications, response dates and records of replies. If a tenderer proposes a different method, record whether it has been accepted, is under evaluation or falls outside the request. The consultant’s tender assessment can explain the practical difference for owners making their decision under the applicable procurement procedure. File the tenders as received, subsequent clarifications and the eventual resolution as separate dated records. A short minute of the decision can point to the full comparison and the associated correspondence.

Turn the comparison into a decision owners can take

A tender recommendation can use a single scenario to show why the ranking matters. Suppose the extent of façade repairs can only be confirmed once access is available. The consultant can identify which elevations the early survey reached, which areas will receive a close inspection and how additional quantities would be valued under the proposed contract. Where a qualification remains open, set out its consequence for access, programme or acceptance beside the recommendation. In the minutes, record the quantity assumption adopted that day, the person authorised to follow up and the decisions that must return to a meeting. Check the contract prepared for signature against the clarifications actually accepted.

Look beyond the stated construction period

Two tenders quoting twelve weeks may assume different starting conditions. Ask when the period begins, which material lead times it includes, whether two lobbies must close together and on which dates communal areas return to use. One offer might run from site possession while another assumes that colours and samples have already been approved. Show the owner’s obligations separately, including consultant reviews and dates on which tenants can clear space. The committee can then compare the relevant milestones and record any early purchasing commitment or additional expense in its decision.