View samples under the arcade’s own lighting
Take a sample large enough to handle to its intended position and view it at opening time and under evening lighting. The old floor alongside it, reflections from shop signs and protection at the base of a wall affect its appearance. Photograph it from the same position at both times. Record the sample number and its intended orientation so the tenants, supplier and adviser can discuss the same material.
Ask what it takes to clean, repair and replace it
Discuss the entrance, lift lobby, escalator landing and shopfronts separately. Cleaning staff know where rainwater collects, while the manager sees the corners repeatedly struck by delivery trolleys. Ask the supplier about cleaning products, whether an individual piece can be replaced and how long another order would take. If spare material is to be held, agree a storage location and label it by floor and finish.
Mark the edge of each tenancy
Ryer’s profile documents the arcade refurbishment at Bayview Garden in Tsuen Wan, with views of corridors, the atrium and escalators. For a similar job, use photographs to agree where thresholds, shutters, signs and floors meet the public area. Give each tenant the dates of the enclosure outside their premises and a plan of the temporary approach. Observe whether customers can find the entrance during the first phase before rolling out the next one.
