MILTON萬昇建築工程

19 images

Infrared and site inspection examples

Pages 61–63 of the company profile pair visible-light photographs of façades with thermal images and the instruments used on site. The profile presents them as inspection examples without naming individual projects.

Infrared surveys and water seepage
Façade windows and temperature bands in a thermal image
Field inspection illustrated in Milton’s company profile. Façade windows and temperature bands in a thermal image · Company profile, p. 61
Concrete façade and window rows photographed in visible light
Field inspection illustrated in Milton’s company profile. Concrete façade and window rows photographed in visible light · Company profile, p. 61
Red latches on a protective instrument case
Field inspection illustrated in Milton’s company profile. Red latches on a protective instrument case · Company profile, p. 62
A street-level view up the façade in the survey sheet
Field inspection illustrated in Milton’s company profile. A street-level view up the façade in the survey sheet · Company profile, p. 62
A thermal image on the screen of a handheld camera
Field inspection illustrated in Milton’s company profile. A thermal image on the screen of a handheld camera · Company profile, p. 62
Thermal camera displaying a façade survey image
Field inspection illustrated in Milton’s company profile. Thermal camera displaying a façade survey image · Company profile, p. 62
Contrasting colour bands in a thermal image
Field inspection illustrated in Milton’s company profile. Contrasting colour bands in a thermal image · Company profile, p. 63
A scaffolded elevation in the survey series
Field inspection illustrated in Milton’s company profile. A scaffolded elevation in the survey series · Company profile, p. 63
A helmeted technician making a record at a concrete surface
Field inspection illustrated in Milton’s company profile. A helmeted technician making a record at a concrete surface · Company profile, p. 63
An instrument probe held against the wall below a window
Field inspection illustrated in Milton’s company profile. An instrument probe held against the wall below a window · Company profile, p. 63
Rows of windows and air-conditioning units on an elevation in the inspection sheet
Field inspection illustrated in Milton’s company profile. Rows of windows and air-conditioning units on an elevation in the inspection sheet · Company profile, p. 63
A technician checking a wall inside a room
Field inspection illustrated in Milton’s company profile. A technician checking a wall inside a room · Company profile, p. 63
A handheld readout next to a building component
Field inspection illustrated in Milton’s company profile. A handheld readout next to a building component · Company profile, p. 63
A technician using a meter against a rough wall surface
Field inspection illustrated in Milton’s company profile. A technician using a meter against a rough wall surface · Company profile, p. 63
Measuring instruments in an open field case
Field inspection illustrated in Milton’s company profile. Measuring instruments in an open field case · Company profile, p. 63
A surveyed elevation behind green scaffold netting
Field inspection illustrated in Milton’s company profile. A surveyed elevation behind green scaffold netting · Company profile, p. 63
Looking up at a building and its projecting balconies in the inspection record
Field inspection illustrated in Milton’s company profile. Looking up at a building and its projecting balconies in the inspection record · Company profile, p. 63
A helmeted technician observing the building from the street
Field inspection illustrated in Milton’s company profile. A helmeted technician observing the building from the street · Company profile, p. 63
Temperature bands following building outlines in a thermogram
Field inspection illustrated in Milton’s company profile. Temperature bands following building outlines in a thermogram · Company profile, p. 63
Back to the project gallery

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team