Walk the accessible route before redesigning a lobby

Follow a visitor from the street through the entrance, intercom and gate to the lift or counter. The actions along that journey give the designer, sample reviewers and building manager a common point of reference.

Accessible bay outside the school
A newly finished accessible bay at the Lai Chi Kok school.

Invite the people who use the entrance to accompany you

Invite a willing wheelchair or walking-aid user, a manager familiar with deliveries or a resident who uses a pushchair to accompany the visit. Ask where they usually enter, how they find the intercom and where they wait when someone approaches in the opposite direction. Observe the route in ordinary use. An open door, the umbrella stand on a wet day or a queue at the counter can change the space available.

Record the actions on a plan without collecting personal histories. Photographs can show the equipment and space with the viewing direction marked. If the route crosses a management boundary between the street and lobby, identify whom the team needs to contact about that section.

Ask the designer to state the applicable requirements

In September 2026 the Buildings Department issued its Design Manual on Universal Accessibility 2026 and described its application in Practice Note APP-176. The note encourages adoption by Authorized Persons and Registered Structural Engineers as far as practicable and explains the relationship with the regulations and proposed enhanced provisions. For an existing building, ask the team to identify the current provisions applicable to this work, the area being altered and the good-practice measures included in the design.

Renewing floor tiles may affect a threshold, recessed mat and gate reader at the same time. Have the designer mark which dimensions and operating spaces need verification and which additional improvements require an owner decision. The purchasing team can then price a consistent specification.

Test a sequence of actions at the sample review

Someone may be able to reach a card reader presented on its own. At the gate the same person may need to hold a cane, pause to use the card and then change direction clear of the door swing. Position the sample items in relation to one another and invite feedback on the door, handle, rail and signs. Have the appropriate professional measure regulated dimensions or operating forces against the selected standard and record the measurement points.

Repeat part of the route in evening light. Record where the entry sign first becomes visible, which wayfinding cue appears at a junction and whether the lift call button is easy to recognise from the approach. Give the designer specific adjustments linked to a position and activity.

Walk the temporary route before the entrance closes

A side door may normally be locked and an apparently wide passage may fill with delivery trolleys. Overlay the work area and hoarding on the usual accessible route. Have the consultant and management office review alternatives, including opening hours, responsibility for keys, directions from the street and a contact for someone who needs assistance.

If a two-day entrance closure would send pedestrians past a basement vehicle exit, review walking and vehicle movements, lighting, signage and supervision before announcing the route. Refer an unusable section back to the design team for a change in phasing or other arrangements. A walk with everyday users before the switch can reveal a simple but decisive mismatch between staffing hours and door access.

Hand the operating conditions to the people managing the lobby

After reopening, cleaning trolleys, seasonal displays and temporary counters can take up the space the design provided. Give the management office the agreed furniture plan, approach areas, contact for door controls and a route for reporting access problems. A maintenance entry should identify the adjustment made, such as a revised opening time or relocated sign, and the date the team reviewed the route again.

Ask a colleague who did not work on the project to travel from the street to the service counter and lift. Record where they had to backtrack, ask someone to open a door or struggle to approach a control. Assign the finding to the appropriate trade or manager and agree a review date while the handover team is available.