What should an owners’ corporation ask a works consultant to deliver?

A consultant’s fee is easier to assess when the brief names the areas to be investigated, the documents to be delivered and the decisions owners will make at each stage.

Two people in reflective vests confer by the water, with a close view of a plan marked using a red pencil.
Two team members review an outdoor location beside the water. A close view shows a red-pencil mark being made on a paper plan.

Start with a question the survey can answer

Suppose the rear staircase of a residential block shows a damp mark after heavy rain. Give the floor, orientation, first reported date, weather, any corresponding mark upstairs and the record of a previous repair. A shopkeeper, an upper-floor resident and the cleaner may have seen different things. Attribute each observation to its occasion. Ask the consultant what can be seen on a first visit, which areas require arrangements with occupiers and how the findings would affect the next decision. Leaving the cause open in the brief lets owners discuss a fee for investigation before committing to a repair specification.

Identify available records and inaccessible places

List the drawings available, with their numbers and revision dates. Identify a letting plan separately from an older approved plan for the same floor. The manager can describe who holds the roof key, when the shop takes deliveries and which communal areas can be seen from a safe position. The Buildings Department’s Building Information Centre provides inspection and copying services for private building and minor works records and occupation permits. Ask each consultant to state who would pay for a records search, special access or a return visit and how an area that could not be inspected would be identified in the survey report.

Give every decision a named deliverable

A major repair may involve several separate decisions. The committee might first ask for a condition report with a location index, then a discussion of priorities with options and estimates, and finally tender documents based on the agreed extent. Identify who will lead visits, answer tender queries, analyse returns, supervise construction and issue certificates. Ask what meetings the fee covers, what the committee receives afterwards and what happens if the named person changes. If a proposal includes periodic visits, ask what determines their timing, what the record will show and where the owners’ representative can find it after the visit.

Use one example at each interview

Give each interviewee the same photograph of a boundary between a workshop and residential accommodation. Invite them to describe the information they would request first, how they would handle an inaccessible area and the decision they would bring back to the corporation. The secretary can record the answers, including the person who would do the work and when another specialist might be needed. Two similar fees can cover quite different combinations of return visits, drawings, estimates and verbal advice. In the recommendation to the committee, identify any open questions about scope and fees, who will answer and by what date.

Keep the appointment and its working documents together

Once a consultant is selected, compare the appointment against the agreed services, drawing list, written clarifications, fee arrangement and authorised contacts. File an accessible copy for the owners and retain each agreed amendment. If the project moves from a whole-building survey to an initial staircase repair, document which original services will still be performed and which will need a separate proposal. A new committee member should be able to open the appointment, the latest amendment and the list of outstanding decisions and understand the work covered by the next consultant’s invoice.

Plan the report presentation and the eventual handover

Discuss the audience for the report before seeking proposals. The building manager may need a floor-by-floor record, a general meeting may need a short comparison of options and an incoming contractor will need a clearly defined scope in the tender documents. If works may extend across two financial years, ask the consultant to mark the first package on a drawing and identify what should be checked again before the second starts. Agree which file formats will be delivered, who may use the material and who will answer tender questions after handover. If the building changes management company between phases, those arrangements make the working documents usable by the incoming team.