Start with the question the drawing must answer
Write down the decision that depends on the record. A ground-floor shop might propose changing its rear door while the building manager wants to establish whether the door opens onto a common escape stair. Give the consultant the street number, block, floor, shop number and a photograph taken from the sales floor towards that door. Ask for the plan that identifies the stair, doorway and adjoining room uses. If drainage runs beside the proposed opening, ask whether a separate drainage drawing would answer that part of the question.
A corner building may use an entrance address that differs from the one on its records. Include both street names and a view of the entrance so the person searching can distinguish between similar ground-floor units.
Know what the two records services hold
The Buildings Department’s Building Information Centre provides inspection and copying of building records, minor works records and occupation permits for private buildings. Its BRAVO service gives registered users online access to available records. When commissioning a search, ask for the file list before paying for copies of a large scheme. This helps a consultant focus on the right block or development phase and price any further search separately.
Keep the file reference, drawing number, title, date and block together when the documents arrive. An occupation permit and a floor plan serve different purposes. File each under its original description. If a record is available in another format, note how it can be obtained and who will follow it up.
Trace a difference between the plan and the premises
At the site visit, ask the project team to mark the observation point, camera direction and date on a copy of the drawing. A partition or a bank of shelving may hide the boundary between two spaces that appear open on a plan. The consultant can check which part of the premises the drawing covered and look for later approved alterations. An item extending across two levels or into a common area may require a record for the floor above or for another works package.
The manager can distinguish an observed feature, an item supported by a record and a question awaiting professional assessment. The Buildings Department explains how owners can consult approved plans and minor works records when a possible unauthorised addition is identified.
Issue the right revision for pricing
In a two-phase shopping arcade, drawings may share the same floor name but show different roof lines, rear lanes or adjoining blocks. Ask the consultant to identify the block from the title information, floor key, connecting stairs and fixed structural features. List the selected drawing number and revision in the tender issue and mark the part under consideration.
If the drawing changes, record which issue it replaces and send the revised information to each party pricing it. Keep a superseded sheet separately where it still has a purpose, perhaps because it shows drains since covered over. The surveyor at the site visit and the owner reviewing the quotation can then identify the particular record behind their decision.
Give the next project a usable record
Suppose the retrieved drawing shows the stair but the rear door opens in a different direction on site. A useful search report identifies the drawing and its date, describes what was observed and names the decision still affected. Ask the consultant whether another record, a measured survey or a separate opinion on the existing arrangement is needed. The change to the doorway can remain a separate pricing item while the rest of the estimate proceeds.
Keep a legible original file and a separate annotated copy. Hand the manager the search date, the role of the person who checked the drawing, any outstanding reference and the next decision. When a new tenant requests a door alteration, the next team can start from the question already identified.
