MILTON萬昇建築工程
From the project archive

From poolside to school gate

A Tsing Yi pool, a Kwun Tong sports ground and a Lai Chi Kok entrance each place building work next to a different part of the school day. The photographs show how to describe that boundary.

Pool basin and lane markings viewed from above
The elevated archive view shows the lane markings in the pool basin.

A set of lane markings gives the campus scale

Looking down over Queen’s College Old Boys’ Association Secondary School in Tsing Yi, the lane markings give the length of the pool a scale that a close view of a tile could never convey. The teaching wing, circulation areas and hillside place the pool within the campus at 1 Tam Kon Shan Road. The Milton and Ryer joint archive and the 2025 company profile describe the 2016 refurbishment as covering indoor facilities, outdoor facilities and the pool. A drained basin and an internal stair landing look quite different in the album, yet each belongs to a stated part of the commission. For a school walk-through, mark the route between them alongside the facilities themselves.

Milton company profile, 2025, pp. 114–115. Also see Milton / Ryer joint archive.

A three-day record at the sports-ground edge

At Delia Memorial School in Kwun Tong, the camera moves to the edge of the sports area. A compact excavator is beside the fence. A narrow trench runs along the wall, and replacement pipe lengths lie side by side. The case sheet on pages 99–100 identifies emergency drain replacement in 2018 and explicitly records completion within three days. That is a meaningful duration for this specific job. The profile also contains a separate entry for the school premises covering 2016–2018. Giving the sports ground its own line in the facilities record preserves both the urgent timescale of the drain works and the much longer period associated with the earlier premises entry.

Milton company profile, 2025, pp. 85–86 and 99–100.

Following the route from the bus bay

At 700 Lai Chi Kok Road, the 2022 Hoi Ping Chamber of Commerce Primary School entry is classified as additions and alterations. The blue-and-white school is recognisable in the wider street view. From lower down, a bus bay, the kerb, a marked bay near the entrance and the covered path become the memorable features. A school planning an access review could follow the route from the bus door to the shelter, asking where a change of level occurs and which sightline a parked vehicle interrupts. Mark the questions on a view that a caretaker and the staff supervising arrivals can both recognise. Dimensions and acceptance records can then be requested for the exact spot.

Milton company profile, 2025, p. 155.

Turning the school timetable into an enquiry

Suppose the initial request simply reads “improve outdoor facilities over the summer”. At the Tsing Yi school, the pool, corridors and internal stairs offer separate places for which opening times can be agreed. At the Kwun Tong sports ground, a contractor considering a similar narrow strip of work would need to know which gate accepts deliveries and when training still takes place. For an entrance like the one on Lai Chi Kok Road, the school can identify arrival times and discuss any alternative drop-off position with staff and transport operators. One line per place, with the user, time window and permissible closure, gives the bursar, consultant and contractor something common to discuss.

Settings from Milton company profile, pp. 99–100, 114–115 and 155. Timetable arrangements are examples for a school brief.

Different staff need different records at reopening

At reopening, the PE teacher wants to know which facilities can be timetabled, the caretaker may eventually need the location of a replaced drain, and staff supervising arrivals need to understand the vehicle and walking routes. The same handover can serve all three if it is organised by facility. A pool and its adjoining indoor areas can be recorded separately. Once the court edge is reinstated, a location photograph tied to a fixed feature and a record drawing will be more useful than an isolated picture of a pipe. For the entrance, a marked-up view can indicate where staff stand. Retaining the school, address and facility in the file name also helps an operator managing several campuses.

School case locations in Milton company profile, pp. 99–100, 114–115 and 155. Handover suggestions are for the owner.

All field notes

Related collections

Project photographs

PROJECT ENQUIRIES

Let’s discuss your project.

Contact our team