A single block at 16–18 Shanghai Street
At 16–18 Shanghai Street in Jordan the 2016–2017 commission was construction of a single-block building. Page 79 names the street numbers and identifies a new build. The Milton and Ryer joint archive retains reinforcement work, an exterior during construction and the building in its street setting. A tightly framed view of steel bars is difficult to place on a map by itself. The wider photographs and numbered property place it back on the Jordan site. The sequence follows a block under construction as it becomes part of the street frontage. An exact pair of street numbers can connect the hoarding, the work area and the building’s later appearance.
Milton company profile, 2025, pp. 79–80. Also see former Milton / Ryer joint archive.
The entrance grille at 407–417 Shanghai Street
Further along Shanghai Street, 407–417 leads to a different commission. Pages 122–123 record refurbishment of the existing building in 2016 in connection with mandatory window and building inspection. An upward view follows scaffolding along the street front, and the other images include small balconies, window bays and the metal grille beneath the entrance lintel. Searching merely by street or by 2016 can bring both projects to the surface. A reader looking for reinforcement during new construction should open 16–18. A reader looking for the refurbishment linked to the inspection schemes should open 407–417. Putting the street numbers in the heading makes that choice possible before opening either set of pictures.
Milton company profile, 2025, pp. 122–123.
Two entries at So Hong Commercial Building
At 41–47 Jervois Street in Sheung Wan, the potential confusion runs the other way. The same So Hong Commercial Building appears twice. Page 84 records ground-floor lobby refurbishment and podium waterproofing in 2021. Page 210 records lobby refurbishment and canopy strengthening in 2024–2025. Both include the lobby, while the podium and canopy describe different parts of the property. Entrance and lobby views can identify the building across the two records. The written dates and scopes are what distinguish the appointments. An enquiry about earlier podium waterproofing should begin with the 2021 entry. A request for the canopy-strengthening records points to the later one.
Milton company profile, 2025, pp. 72, 84 and 210.
A bilingual building name at No. 100
No. 100 Jervois Street also carries a 2024–2025 entry. The bilingual name at the entrance identifies Kong Ling Building. Scaffold netting and a canopy appear outside. Inside, the pictures follow the common stair, lighting in the passage and floor repairs along the base of a wall. These views belong to the refurbishment at Kong Ling Building. They give the commission its own address and subject despite the overlapping dates at So Hong Commercial Building. When tracing an old entrance photograph, look first for lettering, street numbers and the page that carries the picture, then for the finish or handrail. Similar surface treatments can occur in several buildings along the same street.
Milton company profile, 2025, pp. 77 and 209.
A single line that preserves a building’s history
For a management team looking after several properties on one street, a first line can hold the building name in both languages, street-number range, affected level or element and works period. “41–47 Jervois Street, 2021, ground-floor lobby and podium” and “41–47 Jervois Street, 2024–2025, lobby and canopy” will lead to one property with two separate commissions. An incoming image with uncertain location can be held as an unidentified entrance until a colleague supplies the lintel or street sign. This small act of identification keeps a building’s sequence of work legible when its records pass to a new manager.
Compare Milton company profile, pp. 79–80, 84, 122–123 and 209–210.
